
Jonathan Rubin
Industrial Electrician
Electrician with experience of working in industrial set-ups. I have erected projects that have been challenging and have demanded a lot of dedication and attention. I have always worked hard on my projects and it has made me yield success at every stage. I am currently working on a project that requires a higher level of skill. I am also training other electricians to be able to carry out the specialized work that I am doing presently.
Vocational Institute
Certification Electrician (September 1996 to May 1998)
Rowan High
High School Diploma (July 1994 to May 1996)
Overseas Manufacturing Unit-Franco Foods
Industrial Electrician June 2013 to Present 13 years & 1 month
I am responsible for the machinery service routines. I have trained a lot of people at the job and therefore all the electricians in my team make routine checks and I supervise them.
I create reports for the accounts department with full detail of all the equipment that required replacement and repairs.
Noble Electronics
Industrial Electrician February 2009 to May 2013 4 years & 4 months
I maintained the machinery at a regular basis and kept a check on the repair and replacements.
I was also responsible for ensuring that all machinery as well as the electrical equipment was in running condition and maintained.
Henrik Juice
Industrial Electrician April 2004 to January 2009 4 years & 10 months
The compress machines and bottler machines were regularly serviced and i checked the whole machinery for any problems after the factory closed every evening.
It was a tedious duty as I was supposed to finish all the checks and ensure no chances of electrocution, short circuit or damp machinery every night. It taught me a lot about time management and i was appreciated for the efforts.
Star Manufacturing
Electrician January 2000 to March 2004 4 years & 3 months
I was in charge of the packing machinery maintenance as well. I looked after all the fixtures and kept a record of the lights, exhaust fans and other electrical fixtures that were changed or repaired during the month.
I was also responsible for working on the machinery that was used for the manufacturing of products in the whole factory unit.
Award
Industrial Training
- Concealed Wiring
- Electronic Advancement
- Electrical Replacement
- Hydraulic Work
- Wiring and Plan Following
- Machine Restoration
- Electric Repair and Supply
- Engineering Knowledge
- High Speed Lines and Fixes
- Electrical Works
- Fixture Work